Prospect Place

Client

Bellway Homes

Project Start

2006

Overall Budget

£6million

Scope

900 – One, Two & Three bedroom apartments

Bellway Homes – A brand new residential community in Cardiff

The Brief

Bellway Homes required the delivery of a reliable and sustainable mechanical and electrical infrastructure for the delivery of 900 luxury one, two and three bedroom apartments, spread over multiple blocks in the bay area. The development includes fifteen buildings varying from six to ten stories.

ISTL’s Approach

ISTL’s Approach

Each block individually designed in stages and included:

Mechanical

  • Above ground drainage
  • Sanitary ware
  • Ventilation systems
  • Sprinkler systems
  • Water treatment
  • Plant room installation
  • Dry Risers
  • Domestic Hot & cold-water installation

Electrical

  • BNO Distribution
  • Mains Distribution
  • Containment
  • Apartments – Lighting, powers & fire alarm
  • Landlords – Lighting & power
  • External lighting
  • Fire Alarm system
  • Electric heating
  • Data & Telephone
  • Access control system
  • TV Systems
  • Lightning protection
  • Surge protection